Mistral Offshore Consulting
MISTRAL
Offshore Consulting
Offshore Vessel Estimator
Cable Lay & Rock Installation · v8.0 · Indicative Tool
⚓ CLV — Single
☷ CLV — Compare
📈 CLV — Benchmark
🚢 Fleet Database
🪟 SRI — Scope
🚢 SRI — Single Vessel
🏢 SRI — By Company
🏆 SRI — All Companies
🚢
Select a vessel
—
—
Vessel & Project Inputs
Vessel Selection
Project Parameters
nautical miles
Auto-computed
—
—
Schedule Breakdown
ActivityDetailDaysVessel Cost
Select vessel and configure inputs
Project Notes
Shared Project Parameters
Project Scope
Stage 1 — feasibility: vessels that can’t meet draft + UKC vs site depth, or lack a required capability (trefoil / SLB), drop to “not suitable”. Stage 2 — mobilisation: each suitable vessel loads at a cable factory (Prysmian/Nexans/NKT default to their own nearest factory; others to the nearest port) — set each vessel’s loading port, day rate and PM&E in the table. The real sea route (loading port → site, via searoute-ts) at each vessel’s own transit speed feeds the estimator, and vessels are ranked by total cost. Note: the model shuttles transit per reload trip, so multi-campaign projects from distant ports may overstate transit — check the trip count. Cable Runs multiplies tonnage & round-trips (e.g. 3 identical export cables).
Location Map
● site   ● loading ports   —  selected voyage
+ Transpooling port:becomes a selectable loading port
Fleet Database
↻ Loading vessel database...
Enter vessel day rates (€/day). In Admin mode all fields are editable — including photos, specs, and notes. Dimensions sourced from MarineTraffic / official vessel brochures.
Photo Vessel⇅ #⇅ Type⇅ Owner⇅ IMO MMSI Built⇅ Flag LOA (m)⇅ Beam (m) Design Draft (m) AIS Draft (m) TT1 (t)⇅ TT2 (t) TT3 (t) Total (t)⇅ Max Comb. (t)⇅ Trifoil SLB SRI Cargo (t) Max Depth (m) IFP Load Rate (t/hr) Install Rate (t/hr) DP Class Transit Spd (kts) Photo URL Notes Day Rate (€/day)⇅
✓ Day rates applied!
⛅ Rock Installation — Project Scope
Material & Fuel Costs

Rock purchase price per tonne (ex-quarry). Added to vessel day-rate cost to give total project cost. Fuel cost is prepared for future use.

Project Map
Project site Quarry Set site coordinates above to plot
Quarry Selection

Tick the quarries available for this project. Distances are auto-calculated from the site centre coordinates above (haversine × 1.15 routing factor). The tool selects the nearest accessible quarry per grade per campaign.

Campaigns & Berms

Each campaign is a distinct mob→work→demob cycle along a section of the route. Add berms to each campaign with up to 2 rock layers each.

⛅
Select a vessel
—
—
Vessel Selection
Campaign
Vessel Productivity Overrides

Leave blank to use fleet defaults (shown as placeholder). Override for scenario testing.

Cost Add-ons

Applied on top of vessel + material cost. Default 3%.

⚠ No campaigns defined yet — go to the RI — Scope tab to set up the project.
⚠ No campaigns defined yet — go to the SRI — Scope tab first.
⚠ No campaigns defined yet — go to the SRI — Scope tab first.